Transportation Ballot Measures

« Back to Elections
Election Date:
November 06, 2001

Statewide, CO

Outcome: Loss

Results: Failed, 66% - 34%

Use $50 million in existing state surplus to test a mass transit monorail system. Positive test would lead to construction of 167-mile system between DIA and Eagle County Airport, along I-70. Cost: $3.9 billion.

2017 Results
12
States
17 Measures

Win: 15
Loss:  2

Success Rate: 88%

2016 Results
23 States
77 Measures

Win: 55
Loss: 22

 

Success Rate: 71%

--

2015 Results
10 States
34 Measures

Win: 23
Loss: 11

Success Rate: 68%

---

2014 Results YTD
18 States
61 Measures

Win: 42
Loss: 19

Success Rate: 69%

---

2013 Results
8 States
15 Measures

Win: 11
Loss: 4

Success Rate: 73%