Transportation Ballot Measures

« Back to Elections
Election Date:
November 06, 2012

Arlington County, VA

Type: Bond

Outcome: Win

Results: Passed, 80%-20%

A $31,946,000 bond to support capital projects for the Washington Metropolitan Area Transit Authority (WMATA) and other transit, pedestrian, and road projects.

Check out CFTE's 2016 Post-Election Webinar here!

2016 Results
23 States
77 Measures

Win: 55
Loss: 22

 

Success Rate: 71%

--

2015 Results
10 States
34 Measures

Win: 23
Loss: 11

Success Rate: 68%

---

2014 Results YTD
18 States
61 Measures

Win: 42
Loss: 19

Success Rate: 69%

---

2013 Results
8 States
15 Measures

Win: 11
Loss: 4

Success Rate: 73%